ANALISIS NILAI EFEKTIVITAS DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS DAN SIX BIG LOSSES PADA METAL SPINNING MACHINE DI PT. X
PT. X is a company engaged in the lighting industry. In this study, the problem that occurs is the metal spinning machine, which is one of the production points that plays the most role in the manufacture of downlight products. The problem that occurs is the lack of maintenance carried out so that i...
Saved in:
Main Author: | Irsyad Mawardi, (Author) |
---|---|
Format: | Book |
Published: |
2021-12-14.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
ANALISIS PERBAIKAN EFEKTIVITAS MESIN TUBING PEMBUAT TUBE KABEL OPTIK MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) UNTUK MEMINIMALISI SIX BIG LOSSES (Studi Kasus PT. XYZ)
by: Yoga Dwi Yulianto, -
Published: (2017) -
ANALISIS EFEKTIVITAS MESIN MOLDING INJECTIONDENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS DAN SIX BIG LOSSES SEBAGAI DASAR USULAN PERBAIKAN PADA CV. XYZ
by: Agusthina,
Published: (2022) -
Metal Spinning
by: Painter, William A.; Tuells, C. -
ANALISIS EFEKTIFITAS PADA MESIN EXTRUDER (CY65-II) MENGGUNAKAN PENDEKATAN KONSEP TOTAL PRODUCTIVE MAINTENANCE DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS DAN SIX BIG LOSSES DI PT. ABC
by: Andini Lusiana Permata Sari,
Published: (2021) -
New Spin on Metal-Insulator Transitions
Published: (2023)