PEMODELAN SISTEM UNTUK MEREDUKSI WASTE INVENTORI STOK FINISH GOOD AREA PC DENGAN PENDEKATAN LEAN MANUFACTURING DAN SIMULASI PADA PT X

PT X is a company engaged in manufacture of motorcycle equipment and spare parts. During the pandemic period, PT. X still carried out the same production process pattern that had been carried out so far. So identification is needed to reduce or remove activities that are considered wasteful. This re...

Full description

Saved in:
Bibliographic Details
Main Author: Putu Amelia Pratiwi, (Author)
Format: Book
Published: 2021-12-14.
Subjects:
Online Access:Link Metadata
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000 am a22000003u 4500
001 repoupnvj_16261
042 |a dc 
100 1 0 |a Putu Amelia Pratiwi, .  |e author 
245 0 0 |a PEMODELAN SISTEM UNTUK MEREDUKSI WASTE INVENTORI STOK FINISH GOOD AREA PC DENGAN PENDEKATAN LEAN MANUFACTURING DAN SIMULASI PADA PT X 
260 |c 2021-12-14. 
500 |a http://repository.upnvj.ac.id/16261/1/ABSTRAK.pdf 
500 |a http://repository.upnvj.ac.id/16261/2/AWAL.pdf 
500 |a http://repository.upnvj.ac.id/16261/3/BAB%201.pdf 
500 |a http://repository.upnvj.ac.id/16261/4/BAB%202.pdf 
500 |a http://repository.upnvj.ac.id/16261/8/BAB%203.pdf 
500 |a http://repository.upnvj.ac.id/16261/7/BAB%204.pdf 
500 |a http://repository.upnvj.ac.id/16261/6/BAB%205.pdf 
500 |a http://repository.upnvj.ac.id/16261/5/DAFTAR%20PUSTAKA.pdf 
500 |a http://repository.upnvj.ac.id/16261/9/DAFTAR%20RIWAYAT%20HIDUP.pdf 
500 |a http://repository.upnvj.ac.id/16261/10/LAMPIRAN.pdf 
500 |a http://repository.upnvj.ac.id/16261/12/HASIL%20PLAGIARISME.pdf 
500 |a http://repository.upnvj.ac.id/16261/11/ARTIKEL%20KI.pdf 
520 |a PT X is a company engaged in manufacture of motorcycle equipment and spare parts. During the pandemic period, PT. X still carried out the same production process pattern that had been carried out so far. So identification is needed to reduce or remove activities that are considered wasteful. This research purpose to provide recommendation using lean manufacturing methods and production system design with system simulation using ProModel software. Lean manufacturing methods used in this research are Value Stream Mapping (VSM) and Value Stream Analysis Tools (VALSAT), fishbone diagrams, and Simulation Model Design. From the results of data processing with this method, there are recommendations for improvements that can reduce lead time by 12,121.186 seconds or 3.36 hours and increase output by 101 units with a percentage increase of 38.99%. 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
690 |a TA Engineering (General). Civil engineering (General) 
690 |a TL Motor vehicles. Aeronautics. Astronautics 
690 |a TS Manufactures 
655 7 |a Thesis  |2 local 
655 7 |a NonPeerReviewed  |2 local 
787 0 |n http://repository.upnvj.ac.id/16261/ 
787 0 |n http://repository.upnvj.ac.id 
856 4 1 |u http://repository.upnvj.ac.id/16261/  |z Link Metadata