APA (7th ed.) Citation

Dyah Ayu Pitaloka. (2022). PENJADWALAN PREVENTIVE MAINTENANCE KOMPONEN KRITIS MESIN BLISTERING LINE 3 DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) II PADA PT. XY.

Chicago Style (17th ed.) Citation

Dyah Ayu Pitaloka. PENJADWALAN PREVENTIVE MAINTENANCE KOMPONEN KRITIS MESIN BLISTERING LINE 3 DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) II PADA PT. XY. 2022.

MLA (9th ed.) Citation

Dyah Ayu Pitaloka. PENJADWALAN PREVENTIVE MAINTENANCE KOMPONEN KRITIS MESIN BLISTERING LINE 3 DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) II PADA PT. XY. 2022.

Warning: These citations may not always be 100% accurate.