PENJADWALAN PREVENTIVE MAINTENANCE KOMPONEN KRITIS MESIN BLISTERING LINE 3 DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) II PADA PT. XY
PT. XY is a multinational company engaged in the pharmaceutical industry (medicine). The results based on data collection, the highest downtime on line 3 is the Blistering line 3 machine, it shows that the machine is not optimal so it can interfere with the production process. The purpose of this st...
Saved in:
Main Author: | Dyah Ayu Pitaloka, (Author) |
---|---|
Format: | Book |
Published: |
2022-06-09.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
PERANCANGAN PENJADWALAN PERAWATAN MESIN CHILLER DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) II DAN AGE REPLACEMENT DI PT. XYZ
by: Leslie Shofira Wijaya,
Published: (2021) -
PERANCANGAN PENJADWALAN PERAWATAN MESIN MIXER TRANSPARANT SOAP DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) DAN AGE REPLACEMENT DI PT. XYZ
by: Farhan Febrian Putra,
Published: (2021) -
PERANCANGAN PERAWATAN MESIN BLISTERING LINE 1 DENGAN METODE RELIABILITY CENTERED MAINTENANCE II DAN AGE REPLACEMENT DI PT. ABC
by: Renesha Fitri Asilah,
Published: (2022) -
PERANCANGAN PENJADWALAN PERAWATAN MESIN WRAPPER (PACKING) LINE 13 DENGAN METODE RELIABILITY CENTERED MAINTENANCE II PADA PT XYZ
by: Erika Rahmi,
Published: (2022) -
Perencanaan Sistem Perawatan Mesin Rotary Lobe Pump MelaluiReliability Centered Maintenance (RCM) (Studi Kasus PT. Lombok Gandaria)
by: Kuntadi, Akhnanto, et al.
Published: (2013)