ANALISIS KETERLAMBATAN PERAWATAN SHAFT PROPELLER DENGAN METODE FTA DAN FMEA
In this study, the case of delay in maintenance of the KMP Portlink III Ro-Ro Ship shaft was raised. In this case where shaft maintenance can be done within 2-4 days but in the field it can take up to 10 days. In this case, the cause of the problem and proposed improvements to the problems that occu...
Saved in:
Main Author: | Adrian Diko Ananto, (Author) |
---|---|
Format: | Book |
Published: |
2022-06-22.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
ANALISIS KEKUATAN DAN UMUR KELELAHAN SHAFT PROPELLER KAPAL DENGAN METODE KOMPUTASIONAL
by: Adiel Fadhlan Yazid,
Published: (2022) -
ANALISIS BENDING SHAFT PROPELLER PADAKAPAL DENGAN VARIASI BEBAN MENGGUNAKANMETODE FEM
by: Arya Adhikara Idris,
Published: (2022) -
ANALISIS PENGENDALIAN KUALITAS PROSES CASTING BLOK MESIN Z DENGAN METODE QUALITY CONTROL CIRCLE (QCC), FTA, DAN FMEA DI PT. X
by: Rayhan Fajar Sularso,
Published: (2023) -
ANALISIS MATERIAL SHRINKAGE PADA INDUSTRI PENGOLAHAN KARET MENGGUNAKAN METODE FAILURE MODE AND EFFECT ANALYSIS (FMEA) DAN FAULT TREE ANALYSIS (FTA)
by: Afdi Nugraha,
Published: (2023) -
PENGENDALIAN KUALITAS PROSES PRODUKSI KEMEJA DENGAN METODE FAULT TREE ANALYSIS (FTA) DAN FAILURE MODE AND EFFECT ANALYSIS (FMEA) DI CV.ABC
by: Rahmi Dwi Fitriani,
Published: (2022)