ANALISIS KETERLAMBATAN PERAWATAN SHAFT PROPELLER DENGAN METODE FTA DAN FMEA

In this study, the case of delay in maintenance of the KMP Portlink III Ro-Ro Ship shaft was raised. In this case where shaft maintenance can be done within 2-4 days but in the field it can take up to 10 days. In this case, the cause of the problem and proposed improvements to the problems that occu...

Full description

Saved in:
Bibliographic Details
Main Author: Adrian Diko Ananto, (Author)
Format: Book
Published: 2022-06-22.
Subjects:
Online Access:Link Metadata
Tags: Add Tag
No Tags, Be the first to tag this record!