PERANCANGAN SISTEM INSTALASI AIR BERSIH PADA GEDUNG KAMPUS X DENGAN SPESIFIKASI 5 LANTAI

Plumbing system is the important part of building construction that needs to be considered in building. The plumbing system is used to distribute clean water, by measuring the amount of clean water used, the volume of the reservoir, pump head, pump capacity and pump power.To supply clean water in de...

Full description

Saved in:
Bibliographic Details
Main Author: Muhammad Iqbal Darojatun Pritanto, (Author)
Format: Book
Published: 2022-07-28.
Subjects:
Online Access:Link Metadata
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000 am a22000003u 4500
001 repoupnvj_18576
042 |a dc 
100 1 0 |a Muhammad Iqbal Darojatun Pritanto, .  |e author 
245 0 0 |a PERANCANGAN SISTEM INSTALASI AIR BERSIH PADA GEDUNG KAMPUS X DENGAN SPESIFIKASI 5 LANTAI 
260 |c 2022-07-28. 
500 |a http://repository.upnvj.ac.id/18576/1/ABSTRAK.pdf 
500 |a http://repository.upnvj.ac.id/18576/2/AWAL.pdf 
500 |a http://repository.upnvj.ac.id/18576/3/BAB%201.pdf 
500 |a http://repository.upnvj.ac.id/18576/4/BAB%202.pdf 
500 |a http://repository.upnvj.ac.id/18576/5/BAB%203.pdf 
500 |a http://repository.upnvj.ac.id/18576/6/BAB%204.pdf 
500 |a http://repository.upnvj.ac.id/18576/7/BAB%205.pdf 
500 |a http://repository.upnvj.ac.id/18576/8/DAFTAR%20PUSTAKA.pdf 
500 |a http://repository.upnvj.ac.id/18576/9/RIWAYAT%20HIDUP.pdf 
500 |a http://repository.upnvj.ac.id/18576/10/LAMPIRAN.pdf 
500 |a http://repository.upnvj.ac.id/18576/11/HASIL%20PLAGIARISME.pdf 
500 |a http://repository.upnvj.ac.id/18576/12/ARTIKEL%20KI.pdf 
520 |a Plumbing system is the important part of building construction that needs to be considered in building. The plumbing system is used to distribute clean water, by measuring the amount of clean water used, the volume of the reservoir, pump head, pump capacity and pump power.To supply clean water in design of a 5-story building based on a total of 4,584 populations, clean water require of 403 m3 / day. The volume of lower reservoir is 313 m3 and the upper reservoir is 12m3. Based on the results of the design of clean water installations, the pipes used have an inner diameter of 119 m and an outer diameter of 150 mm. and the capacity of the transfer pump used is 1.15 m3 / min with a pump force of 15 kW 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
690 |a TH Building construction 
690 |a TJ Mechanical engineering and machinery 
655 7 |a Thesis  |2 local 
655 7 |a NonPeerReviewed  |2 local 
787 0 |n http://repository.upnvj.ac.id/18576/ 
787 0 |n http://repository.upnvj.ac.id/ 
856 4 1 |u http://repository.upnvj.ac.id/18576/  |z Link Metadata