OPTIMALISASI PROSES PERCEPATAN PENGEDOKAN KAPAL PADA GRAVING DOCK 6000 DWT
The process of ship maintenance and repair is an activity that is very important for ships to sail. In the process of docking the ship at the graving dock, the water in the dock pool will be drained using a pump and fill the door by opening the installed valve. Facilities at a dock will greatly affe...
Saved in:
Main Author: | Aulia Nurahma Solesi, (Author) |
---|---|
Format: | Book |
Published: |
2022-06-22.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
RE-DESIGN PINTU GRAVING DOCK KAPASITAS 6000 DWT
by: Stefanus Parmada,
Published: (2022) -
OPTIMALISASI KEBUTUHAN LISTRIK PADA KAPAL LANDING CRAFT TANK (LCT) 1500 DWT
by: Lilis Sofiah,
Published: (2022) -
PERANCANGAN KAPAL GENERAL CARGO 6000 DWT KECEPATAN 12,5 KNOT DENGAN RUTE PELABUHAN TANJUNG PRIOK JAKARTA - PELABUHAN SOEKARNO HATTA MAKASSAR
by: Toto Septianto, -
Published: (2019) -
RE-DESAIN LAYOUT GALANGAN UNTUK OPTIMALISASI PROSES PEMBANGUNAN DAN REPARASI KAPAL
by: Imelda Septi Andreani,
Published: (2022) -
ANALISIS KEKUATAN KONSTRUKSI FLOATING DOCK MULTI PONTOON 6000 TLC
by: Hizkia Nicolas Simanjuntak,
Published: (2021)