OPTIMALISASI KEBUTUHAN LISTRIK PADA KAPAL LANDING CRAFT TANK (LCT) 1500 DWT
The ship's electrical installation system is the most important system on the ship in order to distribute electrical energy from the generator to each of the special electrical needs on the ship such as lighting loads, power loads, communication and navigation systems. an imbalance between elec...
Saved in:
Main Author: | Lilis Sofiah, (Author) |
---|---|
Format: | Book |
Published: |
2022-06-21.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
REDESIGN GENERATOR LANDING CRAFT TANK 1500 DWT DENGAN MEMPERTIMBANGKAN FAKTOR TEKNIS DAN EKONOMIS
by: Ivan Guntur Perdana,
Published: (2021) -
OPTIMALISASI PROSES PERCEPATAN PENGEDOKAN KAPAL PADA GRAVING DOCK 6000 DWT
by: Aulia Nurahma Solesi,
Published: (2022) -
PERANCANGAN KAPAL BULK CARRIER 13500 DWT KECEPATAN 12 KNOT SEBAGAI PENGANGKUT KEBUTUHAN ASPAL DENGAN RUTE PELAYARAN BAUBAU - JAYAPURA
by: Nita Aviyanti, -
Published: (2019) -
PERANCANGAN KAPAL BULK CARRIER 16500 DWT KECEPATAN 13 KNOT SEBAGAI PENGANGKUTAN KEBUTUHAN SEMEN DENGAN RUTE PELAYARAN SEMARANG - LAMPUNG
by: Siti Muawenah,
Published: (2020) -
METODE PENANGANAN POROSITY PENGELASAN PADA ERECTION BLOCK 10-11 DI TANK DECK KAPAL KRI. TELUK KUPANG
by: Ahmad Munir, -
Published: (2018)