APA (7th ed.) Citation

Erika Rahmi. (2022). PERANCANGAN PENJADWALAN PERAWATAN MESIN WRAPPER (PACKING) LINE 13 DENGAN METODE RELIABILITY CENTERED MAINTENANCE II PADA PT XYZ.

Chicago Style (17th ed.) Citation

Erika Rahmi. PERANCANGAN PENJADWALAN PERAWATAN MESIN WRAPPER (PACKING) LINE 13 DENGAN METODE RELIABILITY CENTERED MAINTENANCE II PADA PT XYZ. 2022.

MLA (9th ed.) Citation

Erika Rahmi. PERANCANGAN PENJADWALAN PERAWATAN MESIN WRAPPER (PACKING) LINE 13 DENGAN METODE RELIABILITY CENTERED MAINTENANCE II PADA PT XYZ. 2022.

Warning: These citations may not always be 100% accurate.