PERANCANGAN PENJADWALAN PERAWATAN MESIN WRAPPER (PACKING) LINE 13 DENGAN METODE RELIABILITY CENTERED MAINTENANCE II PADA PT XYZ
PT XYZ is a company that produces food and beverages. From historical data, the wrapper engine has the highest downtime among other machines. This machine is one of the most important machines in determining the quality of the noodle production process. Failures that appear on this machine will have...
Saved in:
Main Author: | Erika Rahmi, (Author) |
---|---|
Format: | Book |
Published: |
2022-06-29.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
PERANCANGAN PENJADWALAN PERAWATAN MESIN CHILLER DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) II DAN AGE REPLACEMENT DI PT. XYZ
by: Leslie Shofira Wijaya,
Published: (2021) -
PERANCANGAN PENJADWALAN PERAWATAN MESIN MIXER TRANSPARANT SOAP DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) DAN AGE REPLACEMENT DI PT. XYZ
by: Farhan Febrian Putra,
Published: (2021) -
PENJADWALAN PERAWATAN PREVENTIVE MESIN SLOTTING DENGAN MENGGUNAKAN METODE AGE REPLACEMENT DI PT. XYZ
by: Edi Diantoro, -
Published: (2017) -
PENJADWALAN PERAWATAN MESIN DISTILASI MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE II DENGAN PENDEKATAN OVERALL EQUIPMENT EFFECTIVENESS
by: Ajeng Puspita Sari,
Published: (2022) -
PENJADWALAN & PERLAKUAN PERAWATAN MESIN DISTILASI MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE II DAN IMPLEMENTASI APLIKASI ODOO
by: Oktavian, Fariidz Tri
Published: (2023)