PENERAPAN LEAN MANUFACTURING UNTUK MENGURANGI PEMBOROSAN PADA PRODUKSI BATA ABU POLOS DI PABRIK PAVING XYZ

XYZ Paving Factory is one of the factories that produces plain ash bricks in the Kranggan area, Bekasi. In the production process, there were activities that did not provide added value and defective products were found. Lean manufacturing method with 7 waste questionnaire, VALSAT, VSM, FMEA, Fishbo...

Full description

Saved in:
Bibliographic Details
Main Author: Nugie Novanto, (Author)
Format: Book
Published: 2022-06-28.
Subjects:
Online Access:Link Metadata
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000 am a22000003u 4500
001 repoupnvj_18758
042 |a dc 
100 1 0 |a Nugie Novanto, .  |e author 
245 0 0 |a PENERAPAN LEAN MANUFACTURING UNTUK MENGURANGI PEMBOROSAN PADA PRODUKSI BATA ABU POLOS DI PABRIK PAVING XYZ 
260 |c 2022-06-28. 
500 |a http://repository.upnvj.ac.id/18758/1/ABSTRAK.pdf 
500 |a http://repository.upnvj.ac.id/18758/13/AWAL.pdf 
500 |a http://repository.upnvj.ac.id/18758/3/BAB%201.pdf 
500 |a http://repository.upnvj.ac.id/18758/4/BAB%202.pdf 
500 |a http://repository.upnvj.ac.id/18758/5/BAB%203.pdf 
500 |a http://repository.upnvj.ac.id/18758/6/BAB%204.pdf 
500 |a http://repository.upnvj.ac.id/18758/7/BAB%205.pdf 
500 |a http://repository.upnvj.ac.id/18758/8/DAFTAR%20PUSTAKA.pdf 
500 |a http://repository.upnvj.ac.id/18758/9/RIWAYAT%20HIDUP.pdf 
500 |a http://repository.upnvj.ac.id/18758/10/LAMPIRAN.pdf 
500 |a http://repository.upnvj.ac.id/18758/12/HASIL%20PLAGIARISME.pdf 
500 |a http://repository.upnvj.ac.id/18758/11/ARTIKEL%20KI.pdf 
520 |a XYZ Paving Factory is one of the factories that produces plain ash bricks in the Kranggan area, Bekasi. In the production process, there were activities that did not provide added value and defective products were found. Lean manufacturing method with 7 waste questionnaire, VALSAT, VSM, FMEA, Fishbone Diagram, and perform system simulation used in order to reduce the problems found. Based on the results of data processing, it was found that the 3 biggest wastes were from defective products with an average weighting value of 4.25, an increase in excess with an average weighting value of 3.75, and excess production with an average weighting value of 3.63. . The results of the supply simulation show the percentage increase in the average production output of plain ash bricks by 11.2%. 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
690 |a HD28 Management. Industrial Management 
690 |a TS Manufactures 
655 7 |a Thesis  |2 local 
655 7 |a NonPeerReviewed  |2 local 
787 0 |n http://repository.upnvj.ac.id/18758/ 
787 0 |n http://repository.upnvj.ac.id 
856 4 1 |u http://repository.upnvj.ac.id/18758/  |z Link Metadata