TINJAUAN ATAS PROSEDUR PEMBAYARAN GANTI KERUGIAN PENGADAAN TANAH BAGI PROYEK STRATEGIS NASIONAL PADA PERBENDAHARAAN LEMBAGA MANAJEMEN ASET NEGARA

This Final Project Report that has been written aims to find out the procedure for paying compensation for land acquisition for national strategic projects that occurred at the State Asset Management Institute. This final project report also has a specific purpose of writing, namely as a requirement...

Full description

Saved in:
Bibliographic Details
Main Author: Natasya Pauliana Manalu, (Author)
Format: Book
Published: 2022-06-06.
Subjects:
Online Access:Link Metadata
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000 am a22000003u 4500
001 repoupnvj_18884
042 |a dc 
100 1 0 |a Natasya Pauliana Manalu, .  |e author 
245 0 0 |a TINJAUAN ATAS PROSEDUR PEMBAYARAN GANTI KERUGIAN PENGADAAN TANAH BAGI PROYEK STRATEGIS NASIONAL PADA PERBENDAHARAAN LEMBAGA MANAJEMEN ASET NEGARA 
260 |c 2022-06-06. 
500 |a http://repository.upnvj.ac.id/18884/1/ABSTRAK.pdf 
500 |a http://repository.upnvj.ac.id/18884/2/AWAL.pdf 
500 |a http://repository.upnvj.ac.id/18884/3/BAB%201.pdf 
500 |a http://repository.upnvj.ac.id/18884/4/BAB%202.pdf 
500 |a http://repository.upnvj.ac.id/18884/5/BAB%203.pdf 
500 |a http://repository.upnvj.ac.id/18884/6/BAB%204.pdf 
500 |a http://repository.upnvj.ac.id/18884/7/DAFTAR%20PUSTAKA.pdf 
500 |a http://repository.upnvj.ac.id/18884/8/RIWAYAT%20HIDUP.pdf 
500 |a http://repository.upnvj.ac.id/18884/9/LAMPIRAN.pdf 
500 |a http://repository.upnvj.ac.id/18884/10/HASIL%20PLAGIARISME.pdf 
500 |a http://repository.upnvj.ac.id/18884/11/ARTIKEL%20KI.pdf 
520 |a This Final Project Report that has been written aims to find out the procedure for paying compensation for land acquisition for national strategic projects that occurred at the State Asset Management Institute. This final project report also has a specific purpose of writing, namely as a requirement for graduation from the Diploma Three program for the accounting major at the Faculty of Economics and Business at the Veterans National Development University, Jakarta. The author conducts Field Work Practices (PKL) within the State Asset Management Institute, especially in the Treasury division. The procedure for paying compensation for land acquisition is a process of paying compensation to the rightful party whose land is subject to land acquisition for the procurement of the National Strategic Project (PSN) which aims to improve community welfare and equitable distribution of public facilities for smooth transportation towards significant economic growth in every area. region. Payment of compensation to entitled parties is carried out by LMAN, especially in the Treasury division which has the aim of issuing compensation funds to entitled parties through the opening of an account opened by Banking Services. 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
690 |a HB Economic Theory 
690 |a HJ Public Finance 
655 7 |a Thesis  |2 local 
655 7 |a NonPeerReviewed  |2 local 
787 0 |n http://repository.upnvj.ac.id/18884/ 
787 0 |n http://repository.upnvj.ac.id 
856 4 1 |u http://repository.upnvj.ac.id/18884/  |z Link Metadata