PENJADWALAN PERAWATAN MESIN DISTILASI MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE II DENGAN PENDEKATAN OVERALL EQUIPMENT EFFECTIVENESS
UPN Veteran Jakarta's Laboratory has a Distillation Machine that has not been used for 2 years. In this machine, it was found that there was corrosion which made the container in this machine get humidity which caused small holes that caused leaks, decreased surface appearance quality, contamin...
Saved in:
Main Author: | Ajeng Puspita Sari, (Author) |
---|---|
Format: | Book |
Published: |
2022-07-12.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
PENJADWALAN & PERLAKUAN PERAWATAN MESIN DISTILASI MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE II DAN IMPLEMENTASI APLIKASI ODOO
by: Oktavian, Fariidz Tri
Published: (2023) -
PERANCANGAN PENJADWALAN PERAWATAN MESIN WRAPPER (PACKING) LINE 13 DENGAN METODE RELIABILITY CENTERED MAINTENANCE II PADA PT XYZ
by: Erika Rahmi,
Published: (2022) -
PERANCANGAN PENJADWALAN PERAWATAN MESIN CHILLER DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) II DAN AGE REPLACEMENT DI PT. XYZ
by: Leslie Shofira Wijaya,
Published: (2021) -
PERANCANGAN PENJADWALAN PERAWATAN MESIN MIXER TRANSPARANT SOAP DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) DAN AGE REPLACEMENT DI PT. XYZ
by: Farhan Febrian Putra,
Published: (2021) -
PENJADWALAN PREVENTIVE MAINTENANCE KOMPONEN KRITIS MESIN BLISTERING LINE 3 DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) II PADA PT. XY
by: Dyah Ayu Pitaloka,
Published: (2022)