FAKTOR-FAKTOR YANG BERHUBUNGAN DENGAN KEPATUHAN PENGGUNAAN APD PADA PEKERJA PROYEK BINTARO JAYA XCHANGE TAHAP II PT JAYA KONSTRUKSI TAHUN 2022
Construction is a complex activitiy that has a higher risk of work accidents than other sectors. At the Bintaro Jaya Xchange Phase II project, there are still accidents experienced by workers. Even though it is categorized as a minor accident, if an analysis of the causes is carried out, this accide...
Saved in:
Main Author: | Faddiah Azrha Radinda Ditry, (Author) |
---|---|
Format: | Book |
Published: |
2022-07-01.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
FAKTOR-FAKTOR YANG BERHUBUNGAN DENGAN TINGKAT KELELAHAN KERJA PADA PEKERJA PROYEK PEMBANGUNAN BINTARO XCHANGE TAHAP II PT JAYA KONSTRUKSI MANGGALA PRATAMA, TBK., TAHUN 2023 : Faktor-Faktor yang Berhubungan dengan Tingkat Kelelahan Kerja pada Pekerja Proyek Pembangunan Bintaro Xchange Tahap II PT Jaya Konstruksi Manggala Pratama, Tbk., Tahun 2023
by: Shafa Sausan,
Published: (2023) -
HUBUNGAN KESELAMATAN DAN KESEHATAN KERJA TERHADAP KINERJA PEKERJA PT JAYA KONSTRUKSI PROYEK BINTARO JAYA XCHANGE 2
by: Denisa Dewanto,
Published: (2022) -
HUBUNGAN POSTUR KERJA TIDAK ERGONOMIS DENGAN KELUHAN MUSCULOSKELETAL DISORDERS PADA PEKERJA FINISHING PROYEK BINTARO JAYA XCHANGE TAHAP II TAHUN 2022
by: Nada Adinda Irhamna,
Published: (2022) -
ANALISIS KEPUASAN KONSUMEN MINISO DI BINTARO JAYA XCHANGE, TANGERANG SELATAN
by: Atikah Amalia,
Published: (2020) -
FAKTOR PERILAKU KEPATUHAN PENGGUNAAN APD PADA PEKERJA PT X
by: Siti Aifatus Solekhah
Published: (2018)