OPTIMALISASI WAKTU DAN BIAYA PROYEK MENGGUNAKAN METODE CPM, PERT, DAN CRASHING PADA PROYEK PEMBANGUNAN KANTOR KELURAHAN
Project planning requires supporting elements to avoid mistakes, such as adding completion time. Delays occur due to the influence of weather conditions and unmet employee needs. This research uses a village office construction project which takes 154 days. This project experienced a delay in the pr...
Saved in:
Main Author: | Muhammad Sirozjudin Munir, (Author) |
---|---|
Format: | Book |
Published: |
2022-12-06.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
OPTIMALISASI WAKTU DAN BIAYA PROYEK DENGAN METODE CPM, PERT, DAN CRASHING PROYEK LAPANGAN KONTAINER OLEH PT. SINAR CAKRA ABADI
by: Wendi Juliansyah,
Published: (2022) -
OPTIMALISASI PROYEK PEMBANGUNAN RUANG KELAS BARU DENGAN MENGGUNAKAN METODE CPM DAN PERT
by: Qhairun Hasan Al Mubarokah,
Published: (2020) -
OPTIMALISASI PROYEK PENINGKATAN KAPASITAS PELABUHAN BAKAUHEUNI DENGAN METODE CPM, PERT, DAN CRASHING OLEH PT. XYZ
by: Jeremia Radja Moza Malingkas,
Published: (2023) -
OPTIMASI WAKTU DAN BIAYA PADA PROYEK A DENGAN METODE CPM DAN PERT DI PT. XYZ
by: Reni Wulandari,
Published: (2020) -
OPTIMALISASI PROYEK PEMBANGUNAN LAPANGAN PENUMPUKAN EKS DELTA DI PELABUHAN TANJUNG PRIOK OLEH PT. ARYA PERMATA NUSA INDAH DENGAN MENGGUNAKAN METODE CPM, PERT DAN CRASHING
by: Robi Anggara,
Published: (2022)