OPTIMALISASI PROYEK PENINGKATAN KAPASITAS PELABUHAN BAKAUHEUNI DENGAN METODE CPM, PERT, DAN CRASHING OLEH PT. XYZ

In planning a construction project, it is very important to know the optimized time and costs. From the optimal time and cost, the project implementer can get the maximum profit. However, in the implementation of a project, the timeline is often not in accordance with the implementation at the proje...

Full description

Saved in:
Bibliographic Details
Main Author: Jeremia Radja Moza Malingkas, (Author)
Format: Book
Published: 2023-01-04.
Subjects:
Online Access:Link Metadata
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000 am a22000003u 4500
001 repoupnvj_23780
042 |a dc 
100 1 0 |a Jeremia Radja Moza Malingkas, .  |e author 
245 0 0 |a OPTIMALISASI PROYEK PENINGKATAN KAPASITAS PELABUHAN BAKAUHEUNI DENGAN METODE CPM, PERT, DAN CRASHING OLEH PT. XYZ 
260 |c 2023-01-04. 
500 |a http://repository.upnvj.ac.id/23780/22/ABSTRAK.pdf 
500 |a http://repository.upnvj.ac.id/23780/23/AWAL.pdf 
500 |a http://repository.upnvj.ac.id/23780/24/BAB%201.pdf 
500 |a http://repository.upnvj.ac.id/23780/26/BAB%202.pdf 
500 |a http://repository.upnvj.ac.id/23780/27/BAB%203.pdf 
500 |a http://repository.upnvj.ac.id/23780/28/BAB%204.pdf 
500 |a http://repository.upnvj.ac.id/23780/29/BAB%205.pdf 
500 |a http://repository.upnvj.ac.id/23780/30/DAFTAR%20PUSTAKA.pdf 
500 |a http://repository.upnvj.ac.id/23780/14/RIWAYAT%20HIDUP.pdf 
500 |a http://repository.upnvj.ac.id/23780/21/LAMPIRAN.pdf 
500 |a http://repository.upnvj.ac.id/23780/17/ARTIKEL.pdf 
500 |a http://repository.upnvj.ac.id/23780/31/HASIL%20PLAGIARISME.pdf 
520 |a In planning a construction project, it is very important to know the optimized time and costs. From the optimal time and cost, the project implementer can get the maximum profit. However, in the implementation of a project, the timeline is often not in accordance with the implementation at the project location, which can cause an increase in the duration of implementation and an increase in the project implementation budget, resulting in delayed project completion. In this discussion, the case study chosen by the researcher as the object of his research for the analysis of project time acceleration is the Bakauheuni port capacity building project by PT. XYZ. The construction process is planned to take 126 days. However, in reality PT. XYZ experienced a delay of 2 weeks due to delays in the arrival of construction equipment and also external factors. The purpose of this research is to effectively accelerate project completion time in terms of cost and analyze the effectiveness of shortened time using the CPM, PERT and Crashing overtime approaches. So that it can be seen that the acceleration of the duration of the project is the most effective and efficient and the budget does not exceed the budget of this project. The results of this study are 33 critical path work activities so that the optimal acceleration duration for the port dock capacity increase project is 18 days with 108 days remaining work time and an optimal cost of IDR 11,271,963,814 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
690 |a Q Science (General) 
690 |a QA Mathematics 
690 |a QC Physics 
690 |a T Technology (General) 
690 |a TA Engineering (General). Civil engineering (General) 
690 |a TS Manufactures 
655 7 |a Thesis  |2 local 
655 7 |a NonPeerReviewed  |2 local 
787 0 |n http://repository.upnvj.ac.id/23780/ 
787 0 |n http://repository.upnvj.ac.id 
856 4 1 |u http://repository.upnvj.ac.id/23780/  |z Link Metadata