OPTIMALISASI PROYEK PENINGKATAN KAPASITAS PELABUHAN BAKAUHEUNI DENGAN METODE CPM, PERT, DAN CRASHING OLEH PT. XYZ
In planning a construction project, it is very important to know the optimized time and costs. From the optimal time and cost, the project implementer can get the maximum profit. However, in the implementation of a project, the timeline is often not in accordance with the implementation at the proje...
Saved in:
Main Author: | Jeremia Radja Moza Malingkas, (Author) |
---|---|
Format: | Book |
Published: |
2023-01-04.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
OPTIMALISASI PROYEK PENINGKATAN KAPASISTAS DERMAGA PELABUHAN MERAK DENGAN METODE CPM, PERT, DAN TIME COST TRADE OFF OLEH PT. XYZ
by: Tika Syahdillah Daratu,
Published: (2022) -
OPTIMALISASI WAKTU DAN BIAYA PROYEK DENGAN METODE CPM, PERT, DAN CRASHING PROYEK LAPANGAN KONTAINER OLEH PT. SINAR CAKRA ABADI
by: Wendi Juliansyah,
Published: (2022) -
OPTIMALISASI PROYEK PEMBANGUNAN LAPANGAN PENUMPUKAN EKS DELTA DI PELABUHAN TANJUNG PRIOK OLEH PT. ARYA PERMATA NUSA INDAH DENGAN MENGGUNAKAN METODE CPM, PERT DAN CRASHING
by: Robi Anggara,
Published: (2022) -
OPTIMALISASI WAKTU DAN BIAYA PROYEK MENGGUNAKAN METODE CPM, PERT, DAN CRASHING PADA PROYEK PEMBANGUNAN KANTOR KELURAHAN
by: Muhammad Sirozjudin Munir,
Published: (2022) -
OPTIMALISASI PROYEK PEMBANGUNAN RUANG KELAS BARU DENGAN MENGGUNAKAN METODE CPM DAN PERT
by: Qhairun Hasan Al Mubarokah,
Published: (2020)