ANALISIS BEBAN KERJA MENGGUNAKAN METODE FULL TIME EQUIVALENT (FTE) UNTUK MENGOPTIMALKAN JUMLAH TENAGA KERJA DIVISI SERVICE PT. XYZ
PT. XYZ is a heavy equipment distributor company in Indonesia. The scope of this research is focused on the Service Division of PT. XYZ. The reason for choosing the Services Division as the object of this research is that there has been no previous measurement of workforce productivity in that divis...
Saved in:
Main Author: | Teddy Rizki Saputra, (Author) |
---|---|
Format: | Book |
Published: |
2023-07-05.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
ANALISIS BEBAN KERJA MENGGUNAKAN METODE FULL TIME EQUIVALENT (FTE) UNTUK MENGOPTIMALKAN TENAGA KERJA DI GROUP PENGADAAN PT XYZ
by: Salsa Febriyanti,
Published: (2023) -
ANALISIS BEBAN KERJA DENGAN METODE FULL TIME EQUIVALENT (FTE) UNTUK MENGOPTIMALKAN JUMLAH PEGAWAI TIM PLTA X
by: Wahyu Maulana,
Published: (2022) -
IDENTIFIKASI BEBAN KERJA UNTUK MENENTUKAN JUMLAH TENAGA KERJA PROJECT MANAGEMENT OFFICE WILAYAH DISTRIBUSI 2 DI PT XYZ DENGAN MENGGUNAKAN METODE FTE (FULL TIME EQUIVALENT)
by: Nadira Chandra Reyhani,
Published: (2022) -
Analisis Beban Kerja Menggunakan Metode Full Time Equivalent (FTE) Untuk Mengoptimalkan Kinerja Unit Produksi Di PT. X
by: Farah Fauzia Imron, Farah
Published: (2021) -
OPTIMALISASI WORKLOAD ANALYSIS DENGAN METODE FULL TIME EQUIVALENT (FTE) UNTUK MENENTUKAN KEBUTUHAN TENAGA KERJA
by: Ibnu Maulana Ismail, -
Published: (2019)