ANALISIS PENGENDALIAN BAHAN BAKU EXCAVA 200 PADA PT. PINDAD MENGGUNAKAN METODE MATERIAL REQUIREMENT PLANNING (MRP) UNTUK MENGANTISIPASI TERJADINYA KONDISI STOCKOUT
PT. XYZ is a manufacturing company that produces defense and security equipment, as well as products for construction and mining, including Excavators. However, the company faces inventory control issues in the production of Excavators. Three components that frequently experience stockouts are Engin...
Saved in:
Main Author: | Elvira Risha Desianty, (Author) |
---|---|
Format: | Book |
Published: |
2023-07-10.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
ANALISIS SISTEM PENGENDALIAN INTERN PERSEDIAAN BAHAN BAKU KAITANNYA DENGAN KEHANDALAN CATATAN AKUNTANSI PERESMIAN BAHAN BAKU PADA PT. PINDAD PERSERO
by: Indrawan Nugraha, -
Published: (2007) -
ANALISIS SISTEM PENGENDALIAN INTERN PERSEDIAAN BAHAN BAKU KAITANNY A DENGAN .KEHANDALAN CATA TAN AKUNTANSI PERSmlAAN BAHAN BAKU PADA PT. PINDAD (PERSERO)
by: Indrawa Nugraha, -
Published: (2007) -
ANALISIS PENGENDALIAN PERSEDIAAN BAHAN BAKU MENGGUNAKAN SISTEM MRP DENGAN LFL PADA BENGKEL SEPATU XYZ DI CIBADUYUT
by: Jajang, Ahmad Suryana
Published: (2018) -
Analisis Pengelolaan Obat Sebagai Dasar Pengendalian Safety Stock pada Stagnant dan Stockout Obat
by: Fenty Ayu Rosmania, et al.
Published: (2015) -
ANALISIS PERSEDIAAN KEBUTUHAN BAHAN BAKU PADA PRODUK TRAFO DENGAN MENGGUNAKAN METODE MATERIAL REQUIREMENT PLANNING (MRP) DI PT. XYZ
by: Nandika Wisnu Wardana, -
Published: (2017)