KERJA SAMA INDONESIA-FILIPINA DALAM MEMPERTAHANKAN KONEKTIVITAS LAUT DI BAWAH KERANGKA BIMP-EAGA: Studi Kasus Rute Pelayaran Davao/General Santos-Bitung Periode 2019-2022
The Davao/General Santos-Bitung shipping route is one of the sea connectivity projects under the BIMP-EAGA subregional cooperation framework. This connectivity is believed to be able to reduce trade logistics costs and more broadly aims to develop the economy in the border areas of North Sulawesi (I...
Saved in:
Main Author: | Delvira Indah Sari Harahap, (Author) |
---|---|
Format: | Book |
Published: |
2023-07-24.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
PERANCANGAN KAPAL GENERAL CARGO 6800DWT KECEPATAN 10 KNOT DENGAN RUTE PELAYARAN BITUNG - TANJUNG PERAK
by: Aloisius Leonardo,
Published: (2020) -
PERANCANGAN KAPAL GENERAL CARGO 10.700 DWT KECEPATAN 13 KNOT DENGAN RUTE PELAYARAN PELABUHAN TANJUNG PRIOK - PELABUHAN BITUNG
by: Mohammad Farkhan Ali Sofyan, -
Published: (2019) -
PERANCANGAN KAPAL TANKER 17500 DWT KECEPATAN 12 KNOT UNTUK RUTE PELAYARAN BALIKPAPAN - SURABAYA
by: Tesalonika Deby,
Published: (2020) -
PERANCANGAN KAPAL TANKER 8200 DWT DENGAN KECEPATAN 12 KNOT RUTE PELAYARAN MAKASSAR - AMBON
by: Nindya Koesherawati,
Published: (2020) -
PERANCANGAN KAPAL TANKER 7200 DWT KECEPATAN 12 KNOT DENGAN RUTE PELAYARAN BALONGAN - RIAU
by: Theresia Loviza Beto Ladjar,
Published: (2020)