PENJADWALAN & PERLAKUAN PERAWATAN MESIN DISTILASI MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE II DAN IMPLEMENTASI APLIKASI ODOO
UPN Veteran Jakarta's PPIC Laboratory has plans to reactiving a Distillation Machine which has not been used for 2 years, to learning laboratory. So that'snecessary to plan the scheduling and maintenanc machine, but several failures are found in each engine component such as steam leaks, c...
Saved in:
Main Author: | |
---|---|
Format: | Book |
Published: |
2023-07.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Internet
Link Metadata3rd Floor Main Library
Call Number: |
A1234.567 |
---|---|
Copy 1 | Available |