PENJADWALAN & PERLAKUAN PERAWATAN MESIN DISTILASI MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE II DAN IMPLEMENTASI APLIKASI ODOO
UPN Veteran Jakarta's PPIC Laboratory has plans to reactiving a Distillation Machine which has not been used for 2 years, to learning laboratory. So that'snecessary to plan the scheduling and maintenanc machine, but several failures are found in each engine component such as steam leaks, c...
Saved in:
Main Author: | Oktavian, Fariidz Tri (Author) |
---|---|
Format: | Book |
Published: |
2023-07.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
PENJADWALAN PERAWATAN MESIN DISTILASI MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE II DENGAN PENDEKATAN OVERALL EQUIPMENT EFFECTIVENESS
by: Ajeng Puspita Sari,
Published: (2022) -
PERANCANGAN PENJADWALAN PERAWATAN MESIN WRAPPER (PACKING) LINE 13 DENGAN METODE RELIABILITY CENTERED MAINTENANCE II PADA PT XYZ
by: Erika Rahmi,
Published: (2022) -
PERANCANGAN PENJADWALAN PERAWATAN MESIN CHILLER DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) II DAN AGE REPLACEMENT DI PT. XYZ
by: Leslie Shofira Wijaya,
Published: (2021) -
PERANCANGAN PENJADWALAN PERAWATAN MESIN MIXER TRANSPARANT SOAP DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) DAN AGE REPLACEMENT DI PT. XYZ
by: Farhan Febrian Putra,
Published: (2021) -
PENJADWALAN PERAWATAN PREVENTIVE MESIN SLOTTING DENGAN MENGGUNAKAN METODE AGE REPLACEMENT DI PT. XYZ
by: Edi Diantoro, -
Published: (2017)