ANALISIS PERHITUNGAN OVERALL EQUIPMENT EFFECTIVENESS (OEE) PADA MESIN POMPA AIR DISTRIBUSI DI PT SARANA CATUR TIRTA KELOLA (SCTK)
PT Sarana Catur Tirta Kelola (SCTK) is a company engaged in providing clean water. PT SCTK, especially its two distribution pump machines, sometimes experiences downtime which affects the results of its distribution water. Consumer satisfaction does not reach the 90% threshold due to the lack of eff...
Saved in:
Main Author: | |
---|---|
Format: | Book |
Published: |
2023-06-12.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | PT Sarana Catur Tirta Kelola (SCTK) is a company engaged in providing clean water. PT SCTK, especially its two distribution pump machines, sometimes experiences downtime which affects the results of its distribution water. Consumer satisfaction does not reach the 90% threshold due to the lack of effectiveness of the pump machine in distributing treated water. Therefore, it is necessary to calculate and analyze the effectiveness of the pumping machine. The Total Productive Maintenance (TPM) approach utilizes the calculation of Overall Equipment Effectiveness (OEE), which is a broad measure of the effectiveness of machines or equipment by utilizing values based on three main indicators, namely availability rate, performance rate, and rate of quality. After using this approach, it was determined that the OEE values for the distribution pump machines 1 and 2 did not reach the optimal minimum OEE limit of 85%, namely only 67% and 48%. The proposed improvement efforts include the addition of 2 supervisors when repairing pump engines, supervision in returning repair tools after being used on WTP, and establish a SOP in order to set the duration of activities and steps in correct repairs. With changes based on the pattern of researchers' suggestions, companies can increase the effectiveness of values based on OEE calculations by up to 92%. Keywords: effectiveness calculation, Total Productive Maintenance (TPM), Overall Equipment Effectiveness (OEE). |
---|---|
Item Description: | http://repository.upnvj.ac.id/26191/19/ABSTRAK.pdf http://repository.upnvj.ac.id/26191/20/AWAL.pdf http://repository.upnvj.ac.id/26191/21/BAB%201.pdf http://repository.upnvj.ac.id/26191/15/BAB%202.pdf http://repository.upnvj.ac.id/26191/16/BAB%203.pdf http://repository.upnvj.ac.id/26191/17/BAB%204.pdf http://repository.upnvj.ac.id/26191/18/BAB%205.pdf http://repository.upnvj.ac.id/26191/9/RIWAYAT%20HIDUP.pdf http://repository.upnvj.ac.id/26191/22/DAFTAR%20PUSTAKA.pdf http://repository.upnvj.ac.id/26191/10/LAMPIRAN.pdf http://repository.upnvj.ac.id/26191/11/HASIL%20PLAGIARISME.pdf http://repository.upnvj.ac.id/26191/12/ARTIKEL%20KI.pdf |