FAKTOR-FAKTOR YANG BERHUBUNGAN DENGAN KINERJA PEKERJA PROYEK PEMBANGUNAN JALAN TOL CINERE - JAGORAWI SEKSI 3 PT. PP PRESISI TBK
A project acceleration is performed to overcome delayed projects in Section 3 of the Cinere-Jagorawi Toll Road construction. This condition may cause an increase in work demands and working hours, which may lead to poor workers' performance. This study aims to determine factors related to poor...
Saved in:
Main Author: | Aulia Salwadina, (Author) |
---|---|
Format: | Book |
Published: |
2023-06-27.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
ANALISIS FAKTOR-FAKTOR YANG BERHUBUNGAN DENGAN BURNOUT SYNDROME PADA PEKERJA PT PP PRESISI PROYEK TOL CINERE-JAGORAWI SEKSI 3 TAHUN 2023
by: Maulana Hazim Almagribi,
Published: (2023) -
HUBUNGAN FAKTOR PERSONAL DAN PEKERJAAN DENGAN PERILAKU BERBAHAYA PADA PEKERJA PROYEK TOL CINERE - JAGORAWI SEKSI 3 PT PP PRESISI TBK
by: Andika Fajar Hidayatulloh,
Published: (2023) -
EVALUASI PENERAPAN JSA DAN HIRADC PENGGUNAAN TOWER CRANE PADA PROYEK JALAN TOL CINERE-JAGORAWI SEKSI 3 PT PP PRESISI TBK TAHUN 2022
by: Calviano Ramadhani Prakoso,
Published: (2022) -
IMPLEMENTASI GANTI RUGI DALAM PENGADAAN TANAH PEMBANGUNAN JALAN TOL CINERE-JAGORAWI SEKSI II
by: Indira Aisha Pascal,
Published: (2022) -
FAKTOR-FAKTOR YANG BERHUBUNGAN DENGAN KEJADIAN KECELAKAAN KERJA PADA PEKERJA PROYEK PEMBANGUNAN THE PARK MALL SAWANGAN DI AREA MEZZANINE PT. PP PRESISI TBK TAHUN 2019
by: Ganisma Nita Ashari, -
Published: (2019)