ANALISIS BEBAN KERJA UNTUK MENENTUKAN TENAGA KERJA YANG OPTIMAL PADA KARYAWAN DI PT IJI PROYEK KALIBATA CITY DENGAN MENGGUNAKAN METODE MODIFIED FULL TIME EQUIVALENT (M-FTE)
PT IJI is a company that operates in the field of outsource facility services, trade, and technology, one of its projects is at Mall Kalibata City. During the course of the project there were some problems such as the monthly activity plan (RKB) that had been drawn up by the team was not implemented...
Saved in:
Main Author: | Yeni Lisaw Maha, (Author) |
---|---|
Format: | Book |
Published: |
2023-12-19.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
OPTIMALISASI WORKLOAD ANALYSIS DENGAN METODE FULL TIME EQUIVALENT (FTE) UNTUK MENENTUKAN KEBUTUHAN TENAGA KERJA
by: Ibnu Maulana Ismail, -
Published: (2019) -
IDENTIFIKASI BEBAN KERJA UNTUK MENENTUKAN JUMLAH TENAGA KERJA PROJECT MANAGEMENT OFFICE WILAYAH DISTRIBUSI 2 DI PT XYZ DENGAN MENGGUNAKAN METODE FTE (FULL TIME EQUIVALENT)
by: Nadira Chandra Reyhani,
Published: (2022) -
ANALISIS BEBAN KERJA MENGGUNAKAN METODE FULL TIME EQUIVALENT (FTE) UNTUK MENGOPTIMALKAN TENAGA KERJA DI GROUP PENGADAAN PT XYZ
by: Salsa Febriyanti,
Published: (2023) -
ANALISIS BEBAN KERJA MENGGUNAKAN METODE FULL TIME EQUIVALENT (FTE) UNTUK MENGOPTIMALKAN JUMLAH TENAGA KERJA DIVISI SERVICE PT. XYZ
by: Teddy Rizki Saputra,
Published: (2023) -
ANALISIS BEBAN KERJA DENGAN METODE FULL TIME EQUIVALENT (FTE) UNTUK MENGOPTIMALKAN JUMLAH PEGAWAI TIM PLTA X
by: Wahyu Maulana,
Published: (2022)