IMPLEMENTASI DALAM MENENTUKAN PENJADWALAN PRODUKSI DENGAN MENGGUNAKAN METODE NAWAZ ENSCORE & HAM (NEH) UNTUK MEMINIMUMKAN MAKESPAN DI PT. DURAQUIPT CEMERLANG

PT. Duraquipt Cemerlang is a company that applies flowshop systems and First Comer First Serve (FCFS) rule. This method has several disadvantages, one of which is having large turnaround time (makespan). By having a large makespan,then there will be looses, starting with time and expenses. The purpo...

Full description

Saved in:
Bibliographic Details
Main Author: Herinaldi Yoshua Sumanda M, (Author)
Format: Book
Published: 2020-06-24.
Subjects:
Online Access:Link Metadata
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000 am a22000003u 4500
001 repoupnvj_6447
042 |a dc 
100 1 0 |a Herinaldi Yoshua Sumanda M, .  |e author 
245 0 0 |a IMPLEMENTASI DALAM MENENTUKAN PENJADWALAN PRODUKSI DENGAN MENGGUNAKAN METODE NAWAZ ENSCORE & HAM (NEH) UNTUK MEMINIMUMKAN MAKESPAN DI PT. DURAQUIPT CEMERLANG 
260 |c 2020-06-24. 
500 |a http://repository.upnvj.ac.id/6447/1/ABSTRAK.pdf 
500 |a http://repository.upnvj.ac.id/6447/2/AWAL.pdf 
500 |a http://repository.upnvj.ac.id/6447/3/BAB%201.pdf 
500 |a http://repository.upnvj.ac.id/6447/4/BAB%202.pdf 
500 |a http://repository.upnvj.ac.id/6447/5/BAB%203.pdf 
500 |a http://repository.upnvj.ac.id/6447/6/BAB%204.pdf 
500 |a http://repository.upnvj.ac.id/6447/7/BAB%205.pdf 
500 |a http://repository.upnvj.ac.id/6447/8/DAFTAR%20PUSTAKA.pdf 
500 |a http://repository.upnvj.ac.id/6447/9/DAFTAR%20RIWAYAT%20HIDUP.pdf 
500 |a http://repository.upnvj.ac.id/6447/10/LAMPIRAN.pdf 
500 |a http://repository.upnvj.ac.id/6447/11/ARTIKEL%20KI.pdf 
520 |a PT. Duraquipt Cemerlang is a company that applies flowshop systems and First Comer First Serve (FCFS) rule. This method has several disadvantages, one of which is having large turnaround time (makespan). By having a large makespan,then there will be looses, starting with time and expenses. The purpose of this research is to minimize the makespan of PT. Duraquipt Cemerlang and determine the best job order to be used at PT. Duraquipt Cemerlang. Therefore, to be able the answer these purpose, Nawaz Enscore & Ham (NEH) method is used, which is in this methode scheduling, the total work time of all machines is greater, must be given a higher weight to be entered first in schedule. By using these methods, it will be known which method will produc the smallest makespan and which job sequence should be applied to the company. Based on the calculation results, it is obtained that with the NEH method, the value of makespan is 23925 minutes, with job sequence 3-1-2. As for the method applied by the company, namely FCFS, the value of makespan is 44010 minutes with job sequence 2-3-1. 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
546 |a id 
690 |a T Technology (General) 
655 7 |a Thesis  |2 local 
655 7 |a NonPeerReviewed  |2 local 
787 0 |n http://repository.upnvj.ac.id/6447/ 
787 0 |n http://repository.upnvj.ac.id 
856 4 1 |u http://repository.upnvj.ac.id/6447/  |z Link Metadata