PENJADWALAN PREVENTIVE MAINTENANCE KONVEYOR DENGAN PENDEKATAN AGE REPLACEMENT : Studi Kasus PT. X.
PT. X is company that produces a carbon eletrode battery component. Based on data since February 2019 until January 2020, compared to other work stastions, extruder has the highest downtime. The reason of high downtime on extruder caused by the high frequency of breakdown on the conveyor. The mainte...
Saved in:
Main Author: | Yuniar, (Author) |
---|---|
Format: | Book |
Published: |
2020-06-23.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
PENJADWALAN PERAWATAN PREVENTIVE MESIN SLOTTING DENGAN MENGGUNAKAN METODE AGE REPLACEMENT DI PT. XYZ
by: Edi Diantoro, -
Published: (2017) -
PERANCANGAN PENJADWALAN PERAWATAN MESIN CHILLER DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) II DAN AGE REPLACEMENT DI PT. XYZ
by: Leslie Shofira Wijaya,
Published: (2021) -
PERANCANGAN PENJADWALAN PERAWATAN MESIN MIXER TRANSPARANT SOAP DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) DAN AGE REPLACEMENT DI PT. XYZ
by: Farhan Febrian Putra,
Published: (2021) -
PENJADWALAN PREVENTIVE MAINTENANCE KOMPONEN KRITIS MESIN VACUUM MIXER DENGAN PENERAPAN SIMULASI MONTE CARLO PADA PT. X
by: Muhammad Rizal,
Published: (2021) -
PENJADWALAN PREVENTIVE MAINTENANCE KOMPONEN KRITIS MESIN BLISTERING LINE 3 DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) II PADA PT. XY
by: Dyah Ayu Pitaloka,
Published: (2022)