KERJASAMA INVESTASI AMERIKA-INDONESIA DALAM ENERGI BARU TERBARUKAN STUDI KASUS PROGRAM PEMBANGKIT LISTRIK TENAGA BAYU SIDRAP I PERIODE 2015-2018
The lack of the NRE mix is seen from the dominant primary energy such as fossil energy in the current energy mix. By setting a target for the NRE mix in 2025 of 23% and a commitment to reduce greenhouse gas emissions for the world, the development and use of new renewable energy is needed by carryin...
Saved in:
Main Author: | Tasya Yasinki, (Author) |
---|---|
Format: | Book |
Published: |
2020-08-19.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
ANALISIS PERBANDINGAN PEMBANGKIT LISTRIK TENAGA SURYA DENGAN PEMBANGKIT LISTRIK TENAGA ANGIN/BAYU DI LAN CIHERAS TASIKMALAYA
by: Rhamadhanie Winata, -
Published: (2018) -
RANCANG BANGUN PROTOTYPE PEMBANGKIT LISTRIK TENAGA BAYU VERTIKAL AKSIS SKALA MINI
by: Krisna Togi Hamonangan, -
Published: (2018) -
KERJA SAMA INDONESIA DAN JEPANG DALAM PEMBANGUNAN ENERGI BARU TERBARUKAN PROYEK PEMBANGKIT LISTRIK TENAGA AIR (PLTA) RAJAMANDALA PERIODE 2012-2019
by: Siti Intan Syamsiah,
Published: (2020) -
Perancangan Pembangkit Listrik Tenaga Bayu Tipe Horisontal Dua Kipas Delapan Bilah Dengan Generator Axial
by: Setiawan, Wahyu
Published: (2012) -
Pembangkit Listrik Energi Terbarukan Dengan Memanfaatkan Generator Magnet Permanen Pada Sepeda Statis
by: AL HAKIM, MUHAMMAD WASI, et al.
Published: (2014)