ANALISIS EFISIENSI TURBIN UAP PADA PLTGU BLOK I TANJUNG PRIOK BERDASARKAN POLA OPERASI DENGAN MENGGUNAKAN CYCLE TEMPO
Increasing electricity needs must be adjusted to the increasing amount of electricity produced. In addition, the generation process must also develop in a better direction, one of which is to increase the efficiency of the plant. The pattern of operation in the operation of steam turbines at PLTGU w...
Saved in:
Main Author: | |
---|---|
Format: | Book |
Published: |
2020-06-29.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Internet
Link Metadata3rd Floor Main Library
Call Number: |
A1234.567 |
---|---|
Copy 1 | Available |