OPTIMALISASI TENAGA KERJA PADA PT DC DI BIDANG PRODUCTION AND REPAIRMENT DENGAN MENGGUNAKAN METODE FULL TIME EQUIVALENT (FTE)
PT.DC is a manufacturing company that manufactures and repairs pumps.One main problem in PT.DC is the delay in repairs to the LP Drain Pump product due to suboptimal performance of the workforce which causes the product to be assembled but still lacking balance so there is a delay in the delivery of...
Saved in:
Main Author: | Farhan Ihsan Putra, (Author) |
---|---|
Format: | Book |
Published: |
2020-06-26.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
OPTIMALISASI WORKLOAD ANALYSIS DENGAN METODE FULL TIME EQUIVALENT (FTE) UNTUK MENENTUKAN KEBUTUHAN TENAGA KERJA
by: Ibnu Maulana Ismail, -
Published: (2019) -
ANALISIS BEBAN KERJA MENGGUNAKAN METODE FULL TIME EQUIVALENT (FTE) UNTUK MENGOPTIMALKAN TENAGA KERJA DI GROUP PENGADAAN PT XYZ
by: Salsa Febriyanti,
Published: (2023) -
ANALISIS BEBAN KERJA MENGGUNAKAN METODE FULL TIME EQUIVALENT (FTE) UNTUK MENGOPTIMALKAN JUMLAH TENAGA KERJA DIVISI SERVICE PT. XYZ
by: Teddy Rizki Saputra,
Published: (2023) -
IDENTIFIKASI BEBAN KERJA UNTUK MENENTUKAN JUMLAH TENAGA KERJA PROJECT MANAGEMENT OFFICE WILAYAH DISTRIBUSI 2 DI PT XYZ DENGAN MENGGUNAKAN METODE FTE (FULL TIME EQUIVALENT)
by: Nadira Chandra Reyhani,
Published: (2022) -
Analisis Beban Kerja Menggunakan Metode Full Time Equivalent (FTE) Untuk Mengoptimalkan Kinerja Unit Produksi Di PT. X
by: Farah Fauzia Imron, Farah
Published: (2021)