OPTIMALISASI TENAGA KERJA PADA PT DC DI BIDANG PRODUCTION AND REPAIRMENT DENGAN MENGGUNAKAN METODE FULL TIME EQUIVALENT (FTE)

PT.DC is a manufacturing company that manufactures and repairs pumps.One main problem in PT.DC is the delay in repairs to the LP Drain Pump product due to suboptimal performance of the workforce which causes the product to be assembled but still lacking balance so there is a delay in the delivery of...

Full description

Saved in:
Bibliographic Details
Main Author: Farhan Ihsan Putra, (Author)
Format: Book
Published: 2020-06-26.
Subjects:
Online Access:Link Metadata
Tags: Add Tag
No Tags, Be the first to tag this record!

Similar Items