OPTIMALISASI TENAGA KERJA PADA PT DC DI BIDANG PRODUCTION AND REPAIRMENT DENGAN MENGGUNAKAN METODE FULL TIME EQUIVALENT (FTE)
PT.DC is a manufacturing company that manufactures and repairs pumps.One main problem in PT.DC is the delay in repairs to the LP Drain Pump product due to suboptimal performance of the workforce which causes the product to be assembled but still lacking balance so there is a delay in the delivery of...
Saved in:
Main Author: | |
---|---|
Format: | Book |
Published: |
2020-06-26.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!