OPTIMASI WAKTU DAN BIAYA PADA PROYEK A DENGAN METODE CPM DAN PERT DI PT. XYZ
PT. XYZ is an association of several companies engaged in the field of housing development. The company has completed many housing projects and there are some projects being carried out. The company is always required not to experience tardiness in completing a project. Therefore, as the antisipatio...
Saved in:
Main Author: | Reni Wulandari, (Author) |
---|---|
Format: | Book |
Published: |
2020-09-04.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
OPTIMALISASI WAKTU DAN BIAYA PROYEK DENGAN METODE CPM, PERT, DAN CRASHING PROYEK LAPANGAN KONTAINER OLEH PT. SINAR CAKRA ABADI
by: Wendi Juliansyah,
Published: (2022) -
OPTIMALISASI WAKTU DAN BIAYA PROYEK MENGGUNAKAN METODE CPM, PERT, DAN CRASHING PADA PROYEK PEMBANGUNAN KANTOR KELURAHAN
by: Muhammad Sirozjudin Munir,
Published: (2022) -
OPTIMALISASI PROYEK PENINGKATAN KAPASITAS PELABUHAN BAKAUHEUNI DENGAN METODE CPM, PERT, DAN CRASHING OLEH PT. XYZ
by: Jeremia Radja Moza Malingkas,
Published: (2023) -
OPTIMALISASI PROYEK PENINGKATAN KAPASISTAS DERMAGA PELABUHAN MERAK DENGAN METODE CPM, PERT, DAN TIME COST TRADE OFF OLEH PT. XYZ
by: Tika Syahdillah Daratu,
Published: (2022) -
PENJADWALAN PROYEK DAN PENGENDALIAN SUMBER DAYA DENGAN METODE PERT / CPM DAN ENTROPY MAXIMIZATION RESOURCES - LEVELING PADA PROYEK PEMBANGUNAN HOTEL XYZ BALIKPAPAN
by: Samsi Marabat LuhuLima, -
Published: (2015)