ANALISIS MULTI RESOURCE ALLOCATION PADA PROYEK IT (STUDI KASUS : PROYEK PEMBUATAN SISTEM INFORMASI ERP)
ERP information system development project for PT. XY is a project undertaken by PT. J by adjusting the desired and required customizations from PT. XY. Constraints in the initial plan of this project, namely requiring more time and overtime to meet the limited human resources in the project. Thus,...
Saved in:
Main Author: | Dinda Tria Pratiwi, (Author) |
---|---|
Format: | Book |
Published: |
2021-02-01.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
PEMBUATAN TIME SCHEDULE PADA PROYEK PEMBANGUNAN PERUMAHAN
by: Aryan Hadiyana, -
Published: (2011) -
SISTEM INFORMASI MONITORING PROYEK BERBASIS WEBSITE (STUDI KASUS : PT ELECTRONIC DATA INTERCHANGE INDONESIA)
by: Tantri Dwi Tyastuti,
Published: (2023) -
SISTEM INFORMASI MONITORING PROYEK TOWER TELEKOMUNIKASI PADA PT. ADYAWINSA TELECOMMUNICATION & ELECTRICAL
by: Aji Suryana,
Published: (2022) -
SISTEM INFORMASI MANAJEMEN PROYEK KONSULTAN TEKNOLOGI INFORMASI BERBASIS WEB PADA PT YCP SOLIDIANCE INDONESIA
by: Lishera Rizqi Rahmatulloh,
Published: (2021) -
ANALISIS FAKTOR PENYEBAB KETERLAMBATAN PEKERJAAN PROYEK KONSTRUKSI: Studi Kasus pada proyek yang dibangun oleh PT. Wijaya Karya
by: Sihombing, Ernila Fransiska
Published: (2014)