Sources of Weapon System Cost Growth Analysis of 35 Major Defense Acquisition Programs
This analysis uses data from Selected Acquisition Reports to determine the causes of cost growth in 35 mature major defense acquisition programs. Four major sources of growth are identified: (1) errors in estimation and scheduling, (2) decisions by the government, (3) financial matters, and (4) misc...
Kaydedildi:
Yazar: | |
---|---|
Diğer Yazarlar: | , , , |
Materyal Türü: | Elektronik Kitap Bölümü |
Dil: | İngilizce |
Baskı/Yayın Bilgisi: |
RAND Corporation
2008
|
Konular: | |
Online Erişim: | DOAB: download the publication DOAB: description of the publication |
Etiketler: |
Etiketle
Etiket eklenmemiş, İlk siz ekleyin!
|
MARC
LEADER | 00000naaaa2200000uu 4500 | ||
---|---|---|---|
001 | doab_20_500_12854_114730 | ||
005 | 20231005 | ||
003 | oapen | ||
006 | m o d | ||
007 | cr|mn|---annan | ||
008 | 20231005s2008 xx |||||o ||| 0|eng d | ||
020 | |a MG670AF | ||
020 | |a 9780833045249 | ||
020 | |a 9780833042897 | ||
040 | |a oapen |c oapen | ||
024 | 7 | |a 10.7249/MG670AF |c doi | |
041 | 0 | |a eng | |
042 | |a dc | ||
072 | 7 | |a TTM |2 bicssc | |
100 | 1 | |a Bolten, Joseph G. |4 auth | |
700 | 1 | |a Leonard, Robert S. |4 auth | |
700 | 1 | |a Arena, Mark V. |4 auth | |
700 | 1 | |a Younossi, Obaid |4 auth | |
700 | 1 | |a Sollinger, Jerry M. |4 auth | |
245 | 1 | 0 | |a Sources of Weapon System Cost Growth |b Analysis of 35 Major Defense Acquisition Programs |
260 | |b RAND Corporation |c 2008 | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a computer |b c |2 rdamedia | ||
338 | |a online resource |b cr |2 rdacarrier | ||
506 | 0 | |a Open Access |2 star |f Unrestricted online access | |
520 | |a This analysis uses data from Selected Acquisition Reports to determine the causes of cost growth in 35 mature major defense acquisition programs. Four major sources of growth are identified: (1) errors in estimation and scheduling, (2) decisions by the government, (3) financial matters, and (4) miscellaneous. The analysis shows that more than two-thirds of cost growth (measured as simple averages) is caused by decisions, most of which involve quantity changes, requirements growth, and schedule changes. | ||
540 | |a All rights reserved |4 http://oapen.org/content/about-rights | ||
546 | |a English | ||
650 | 7 | |a Military engineering |2 bicssc | |
653 | |a Technology | ||
856 | 4 | 0 | |a www.oapen.org |u https://www.jstor.org/stable/10.7249/MG670AF |7 0 |z DOAB: download the publication |
856 | 4 | 0 | |a www.oapen.org |u https://directory.doabooks.org/handle/20.500.12854/114730 |7 0 |z DOAB: description of the publication |