TREATABILITY OF A FIBERBOARD UNIT EFFLUENT
A pilot anaerobic filter was used to remove COD from Babolsar fiberboard production wastewater. The anaerobic filter was packed with ceramic packings and operated at different organic loading rates of 2.4 and 8 kg COD/m3 /day, in 20, 10 and 5 days hydraulic retention time (HRTI), respectively. The r...
Сохранить в:
Главные авторы: | , , |
---|---|
Формат: | |
Опубликовано: |
Tehran University of Medical Sciences,
1998-03-01T00:00:00Z.
|
Предметы: | |
Online-ссылка: | Connect to this object online. |
Метки: |
Добавить метку
Нет меток, Требуется 1-ая метка записи!
|
Internet
Connect to this object online.3rd Floor Main Library
Шифр: |
A1234.567 |
---|---|
Копировать 1 | Доступно |