Environmental Study on Discharged Wastewater of Albourz Industrial City

The treatment facility of Albourz Industrial City was established in 1999 at the southeast of Albourz Mountain with an area of 200,000 square meters. Currently, 40,000 cubic meters of industrial wastes are treated daily utilizing biological method of activated sludge up to the second phase without c...

Cur síos iomlán

Sábháilte in:
Sonraí bibleagrafaíochta
Príomhchruthaitheoirí: E Yassini (Údar), M Hedayati (Údar)
Formáid: LEABHAR
Foilsithe / Cruthaithe: Tehran University of Medical Sciences, 2005-03-01T00:00:00Z.
Ábhair:
Rochtain ar líne:Connect to this object online.
Clibeanna: Cuir clib leis
Níl clibeanna ann, Bí ar an gcéad duine le clib a chur leis an taifead seo!

Ar líne

Connect to this object online.

3rd Floor Main Library

Sonraí sealbhúcháin ó 3rd Floor Main Library
Gairmuimhir: A1234.567
Cóip 1 Ar fáil