ANALISIS ESTIMASI COST-VOLUME-PROFIT (CVP) DALAM HUBUNGANNYA DENGAN PERENCANAAN LABA PADA HOTEL TLOGO MAS SARANGAN
This research aims to analyze the estimated Cost-Volume-Profit (CVP) in association with the Profit Planning at Tlogo Mas Hotel Sarangan. Analytical techniques used in this study were: (1) Classify all costs incurred in the variable costs (variable costs) and fixed costs (fixed cost). (2) Method of...
Saved in:
Main Author: | |
---|---|
Format: | Book |
Published: |
Universitas PGRI Madiun,
2012-12-01T00:00:00Z.
|
Subjects: | |
Online Access: | Connect to this object online. |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Internet
Connect to this object online.3rd Floor Main Library
Call Number: |
A1234.567 |
---|---|
Copy 1 | Available |