استخدام التخطيط الشبكي CPMو PERTفي جدولة عمليات الصيانة لمعمل درفلة الحديد (دراسة حالة مصنع حميشو للمعادن)

The research aims to study the impact of production management on industrial facilities by scheduling special production processes for the iron mill malfunction. To achieve this goal، cpm(Critical Path Method) and pert (Program Evaluating and Review Technique) were used to network planning methods i...

Full description

Saved in:
Bibliographic Details
Main Authors: حاتم محمودي (Author), أيمن يوسف (Author), تركان حمزه (Author)
Format: Book
Published: Tishreen University, 2019-08-01T00:00:00Z.
Subjects:
Online Access:Connect to this object online.
Tags: Add Tag
No Tags, Be the first to tag this record!

Internet

Connect to this object online.

3rd Floor Main Library

Holdings details from 3rd Floor Main Library
Call Number: A1234.567
Copy 1 Available