Tooth # 19 Full Cast Crown Preparation Chamfer
Abstract This resource contains a 20-minute long, fully-narrated instructional video depicting the stepwise procedure for the preparation of tooth #19, a mandibular left first molar, for a full crown cast restoration using a chamfer-type finishing line. The procedure is performed on a mannequin mand...
Saved in:
Main Authors: | Meir Kozlovsky (Author), Kumar Shanmugam (Author), William Skiba (Author), Peter Furnari (Author) |
---|---|
Format: | Book |
Published: |
Association of American Medical Colleges,
2011-06-01T00:00:00Z.
|
Subjects: | |
Online Access: | Connect to this object online. |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Tooth # 21 Ceramo - Metal Preparation
by: Meir Kozlovsky, et al.
Published: (2011) -
Comparison between deep chamfer and 135 ̊ tooth preparation designs on marginal fit and marginal gap in posterior metal-ceramic crowns
by: Pooya Jannati, et al.
Published: (2020) -
Comparison of Chamfer and Deep Chamfer Preparation Designs on the Fracture Resistance of Zirconia Core Restorations
by: Ezatollah Jalalian, et al.
Published: (2011) -
A Study on Marginal Continuty of Shoulder and Chamfer Finish Line of Metal Crown
by: Mahenaz Munira, et al.
Published: (2017) -
All-Ceramic Crown Tooth Preparation and Provisional Crown Fabrication
by: Cecilia Aragon
Published: (2009)