Challenges faced by G1 contractors / Fatin Nabilah Imam and Mohd Esham Mamat
Nowadays, the number of contractors involved in construction industry is increasingly. The data obtained from Construction Industry Development Board Malaysia (CIDB) of contractor registered especially G1 contractor more than fifty thousand. However, the domination and performance of Bumiputra small...
Saved in:
Main Authors: | Imam, Fatin Nabilah (Author), Mamat, Mohd Esham (Author) |
---|---|
Format: | Book |
Published: |
2019.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Solution to avoid mistakes done by the contractor in tender submission / Megat Aridh Ilmi and Mohd Esham Mamat
by: Ilmi, Megat Aridh, et al.
Published: (2020) -
Defect in the industrialised building system (IBS) building / Mohd Esham Mamat ... [et al.]
by: Mamat, Mohd Esham, et al.
Published: (2012) -
The readiness of building information modeling (BIM) application in quantity surveying firm for quality improvement / Muhammad Syazwan Abdullah Sahaimi and Mohd Esham Mamat
by: Abdullah Sahaimi, Muhammad Syazwan, et al.
Published: (2018) -
Imperfection of tender document : a solution towards sustainable construction practice in Malaysia / Mohd Esham Mamat ... [et al.]
by: Mohd Esham, Mamat, et al.
Published: (2015) -
Building Information Modeling (BIM) implementation - Quantity surveying firm practices for quality improvement / Mohd Esham Mamat, Shahela Mamter and Noor Anisah Abdullah
by: Mamat, Mohd Esham, et al.
Published: (2021)