On site manufacturing (OSM) construction through lifting system for a modern high-rise building / Muhammad Fauzan Naim Murad and Mohd Rofdzi Abdullah
In line of high-rise construction there have several issues are state like timeframe of the development, the accident that occur throughout construction and weather that impact material handling from bottom to the highest of the building. This innovation is to enhancements within the construction of...
Saved in:
Main Authors: | , |
---|---|
Format: | Book |
Published: |
2019.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Internet
Link Metadata3rd Floor Main Library
Call Number: |
A1234.567 |
---|---|
Copy 1 | Available |