Building construction completion delays: factors and effects / Muhammad Tarmizi Abd Rashid and Sr. Dr. Nor Suzila Lop

Investing to the construction project does not promise a profit to the clients. The project can be delay or worse, which is abandonment. Each client want their project going well so they can meet their objectives. Therefore, this research aim to minimize the delay of building construction completion...

Full description

Saved in:
Bibliographic Details
Main Authors: Abd Rashid, Muhammad Tarmizi (Author), Lop, Nor Suzila (Author)
Format: Book
Published: 2020.
Subjects:
Online Access:Link Metadata
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000 am a22000003u 4500
001 repouitm_57781
042 |a dc 
100 1 0 |a Abd Rashid, Muhammad Tarmizi  |e author 
700 1 0 |a Lop, Nor Suzila  |e author 
245 0 0 |a Building construction completion delays: factors and effects / Muhammad Tarmizi Abd Rashid and Sr. Dr. Nor Suzila Lop 
260 |c 2020. 
500 |a https://ir.uitm.edu.my/id/eprint/57781/1/57781.pdf 
520 |a Investing to the construction project does not promise a profit to the clients. The project can be delay or worse, which is abandonment. Each client want their project going well so they can meet their objectives. Therefore, this research aim to minimize the delay of building construction completion in Malaysia. The objectives of this research are (i) To identify the factors affecting delays of building construction completion in Malaysia (ii) To determine the effects of building construction completion delays to the clients, consultants and contractors (iii) To suggest action that could minimize building construction delays. In order to achieve the objectives, 90 questionnaires were distributed to the project clients, contractors, and construction consultant. Clients often change order during construction phase frequently is the main factor affecting delays, clients delay getting profit from the development as the main effect of delays and clients should ease the interim payment and do it on time as the main steps to minimize delays. 
546 |a en 
690 |a TH Building construction 
690 |a Building failures, errors, defects, etc. 
655 7 |a Conference or Workshop Item  |2 local 
655 7 |a PeerReviewed  |2 local 
787 0 |n https://ir.uitm.edu.my/id/eprint/57781/ 
856 4 1 |u https://ir.uitm.edu.my/id/eprint/57781/  |z Link Metadata