Building construction completion delays: factors and effects / Muhammad Tarmizi Abd Rashid and Sr. Dr. Nor Suzila Lop
Investing to the construction project does not promise a profit to the clients. The project can be delay or worse, which is abandonment. Each client want their project going well so they can meet their objectives. Therefore, this research aim to minimize the delay of building construction completion...
Furkejuvvon:
Váldodahkkit: | Abd Rashid, Muhammad Tarmizi (Dahkki), Lop, Nor Suzila (Dahkki) |
---|---|
Materiálatiipa: | Girji |
Almmustuhtton: |
2020.
|
Fáttát: | |
Liŋkkat: | Link Metadata |
Fáddágilkorat: |
Lasit fáddágilkoriid
Eai fáddágilkorat, Lasit vuosttaš fáddágilkora!
|
Geahča maid
-
An empirical investigation on factors improving the execution of Key Performance Indicators (KPIs) for assessing the operational performance of PPP projects / Nor Suzila Lop
Dahkki: Lop, Nor Suzila
Almmustuhtton: (2021) -
An 'Amalgamated-Model' of performance measurement for private finance initiative project in Malaysia / Nor Suzila Lop, Kharizam Ismail and Haryati Mohd Isa
Dahkki: Nor Suzila, Lop, et al.
Almmustuhtton: (2017) -
The industrial player's insight on current conditions of public playground for children with disabilities / Nor Suzila Lop ... [et al.]
Dahkki: Lop, Nor Suzila, et al.
Almmustuhtton: (2022) -
Identifying level of awareness on sufficiency of safety and health requirements amongst contractors / Nor Suzila Lop, Izatul Farrita Mohd Kamar and Norazlin Mat Salleh
Dahkki: Lop, Nor Suzila, et al.
Almmustuhtton: (2012) -
Key success factors of green building implementation in Malaysia construction industry / Nor Suzila Lop, Asmalia Che Ahmad and Nik Aqlima Diyana Nik Zulkipli
Dahkki: Nor Suzila, Lop, et al.
Almmustuhtton: (2015)