Optimizing log supply from timber concession complex, Dungun, Terengganu to their subsidiaries down stream processing mills using linear programming model / Ahmad Fauzi Puasa, Mohd Shahwahid Othman and Amir Abdul Nasir Shaari
This paper attempts to solve the problem of irregular supply of logs to the mills within the same holding company. Linear programming model analysis has been used in solving this problem. The logs supply from concession area is not sufficient. Buying additional logs from other log yards to meet the...
Saved in:
Main Authors: | , , |
---|---|
Format: | Book |
Published: |
2002.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Internet
Link Metadata3rd Floor Main Library
Call Number: |
A1234.567 |
---|---|
Copy 1 | Available |