Analysis of development planning of own use gas pipeline from gas compressor stations to gathering stations in X field / Muhammad Ariyon, Muhammad Setriya Ramadhan

Trunkline gas network system from Gas Compressor Station (GCS) B to GS.B-GS.B5 has a total distance of 18 km. The distance of GS.B4-GS.B5 is 9400 m. Gas is the main fuel for engines at gathering stations. A deadlock was found on the GS.B4-GS.B5 pipeline. The solution to this problem is to plan a pip...

Full description

Saved in:
Bibliographic Details
Main Authors: Ariyon, Muhammad (Author), Ramadhan, Muhammad Setriya (Author)
Format: Book
Published: Universiti Teknologi MARA, Sarawak, 2023-03.
Subjects:
Online Access:Link Metadata
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000 am a22000003u 4500
001 repouitm_79835
042 |a dc 
100 1 0 |a Ariyon, Muhammad  |e author 
700 1 0 |a Ramadhan, Muhammad Setriya  |e author 
245 0 0 |a Analysis of development planning of own use gas pipeline from gas compressor stations to gathering stations in X field / Muhammad Ariyon, Muhammad Setriya Ramadhan 
260 |b Universiti Teknologi MARA, Sarawak,   |c 2023-03. 
500 |a https://ir.uitm.edu.my/id/eprint/79835/1/79835.pdf 
520 |a Trunkline gas network system from Gas Compressor Station (GCS) B to GS.B-GS.B5 has a total distance of 18 km. The distance of GS.B4-GS.B5 is 9400 m. Gas is the main fuel for engines at gathering stations. A deadlock was found on the GS.B4-GS.B5 pipeline. The solution to this problem is to plan a pipeline between GS.B4-GS.B5 for optimal gas supply. This study conducted an economic analysis of the planning of pipe construction with the same trunkline diameter. The diameter was selected by looking at the effect of pressure drop and erosional velocity using the Pipesim. Then, a problem-solving approach was taken by building a system using a pig launcher. Based on the research results, in the existing conditions with a distance of 9400 m using a diameter of 6 and 4 inches, there is a high pressure drop. Scenario planning minimizes pressure drop by using equal diameter pipes of 4, 6 and 8 inches. The analysis results show that the selected diameter is 6 inches. Pig launcher is designed with safe specs and design. Calculation of the project's economic indicators with an investment of 505,911 US$M and an oil price of 62.38 US$/bbl. 
546 |a en 
690 |a H Social Sciences (General) 
690 |a Research 
655 7 |a Article  |2 local 
655 7 |a PeerReviewed  |2 local 
787 0 |n https://ir.uitm.edu.my/id/eprint/79835/ 
787 0 |n https://jsst.uitm.edu.my/index.php/jsst 
856 4 1 |u https://ir.uitm.edu.my/id/eprint/79835/  |z Link Metadata