Analysis of development planning of own use gas pipeline from gas compressor stations to gathering stations in X field / Muhammad Ariyon, Muhammad Setriya Ramadhan
Trunkline gas network system from Gas Compressor Station (GCS) B to GS.B-GS.B5 has a total distance of 18 km. The distance of GS.B4-GS.B5 is 9400 m. Gas is the main fuel for engines at gathering stations. A deadlock was found on the GS.B4-GS.B5 pipeline. The solution to this problem is to plan a pip...
Saved in:
Main Authors: | , |
---|---|
Format: | Book |
Published: |
Universiti Teknologi MARA, Sarawak,
2023-03.
|
Subjects: | |
Online Access: | Link Metadata |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Internet
Link Metadata3rd Floor Main Library
Call Number: |
A1234.567 |
---|---|
Copy 1 | Available |