Analysis of development planning of own use gas pipeline from gas compressor stations to gathering stations in X field / Muhammad Ariyon, Muhammad Setriya Ramadhan

Trunkline gas network system from Gas Compressor Station (GCS) B to GS.B-GS.B5 has a total distance of 18 km. The distance of GS.B4-GS.B5 is 9400 m. Gas is the main fuel for engines at gathering stations. A deadlock was found on the GS.B4-GS.B5 pipeline. The solution to this problem is to plan a pip...

Volledige beschrijving

Bewaard in:
Bibliografische gegevens
Hoofdauteurs: Ariyon, Muhammad (Auteur), Ramadhan, Muhammad Setriya (Auteur)
Formaat: Boek
Gepubliceerd in: Universiti Teknologi MARA, Sarawak, 2023-03.
Onderwerpen:
Online toegang:Link Metadata
Tags: Voeg label toe
Geen labels, Wees de eerste die dit record labelt!

Internet

Link Metadata

3rd Floor Main Library

Exemplaargegevens van 3rd Floor Main Library
Plaatsingsnummer: A1234.567
Kopie 1 Beschikbaar