Analysis of development planning of own use gas pipeline from gas compressor stations to gathering stations in X field / Muhammad Ariyon, Muhammad Setriya Ramadhan
Trunkline gas network system from Gas Compressor Station (GCS) B to GS.B-GS.B5 has a total distance of 18 km. The distance of GS.B4-GS.B5 is 9400 m. Gas is the main fuel for engines at gathering stations. A deadlock was found on the GS.B4-GS.B5 pipeline. The solution to this problem is to plan a pip...
Bewaard in:
Hoofdauteurs: | Ariyon, Muhammad (Auteur), Ramadhan, Muhammad Setriya (Auteur) |
---|---|
Formaat: | Boek |
Gepubliceerd in: |
Universiti Teknologi MARA, Sarawak,
2023-03.
|
Onderwerpen: | |
Online toegang: | Link Metadata |
Tags: |
Voeg label toe
Geen labels, Wees de eerste die dit record labelt!
|
Gelijkaardige items
-
ASSESSMENT OF CUSTOMER SERVICE QUALITY OF THE GAS STATION NETWORK IN LITHUANIA
door: Remigijus Kinderis, et al.
Gepubliceerd in: (2023) -
GFR and Blood Lead Levels in Gas Station Workers Based on δ-Alad Gene Polymorphisms
door: Lantip Rujito, et al.
Gepubliceerd in: (2015) -
Modeling the Consequences of Methane Gas Expansion in a CNG Fuel Stations of Isfahan Province
door: Mahdieh Rastimehr, et al.
Gepubliceerd in: (2021) -
Benzene health risk assessment for neurological disorders of gas station employees in Rayong Province, Thailand
door: Anamai Thetkathuek, et al.
Gepubliceerd in: (2023) -
Artificial Neural Network Backpropagation for Predicting Rainfall (Case Study in Sultan Muhammad Kaharuddin Meteorological Station)
door: Romi Aprianto, et al.
Gepubliceerd in: (2023)