A review of current issues in Industrialised Building System (IBS) for construction projects / Mohd Reeza Yusof ... [et al.]

In Malaysia, the concept of prefabrication is known as Industrialised Building System (IBS). In terms of cost, time, productivity, and quality, IBS is certainly beneficial based on previous local and international research. As part of Construction Industry Development Board (CIDB), CIDB's Const...

Full description

Saved in:
Bibliographic Details
Main Authors: Yusof, Mohd Reeza (Author), Jabar2, Izatul Laili (Author), Nawawi, Abdul Hadi (Author), Mohd Nawi, Mohd Nasrun (Author)
Format: Book
Published: UiTM Press, 2024-01.
Subjects:
Online Access:Link Metadata
Tags: Add Tag
No Tags, Be the first to tag this record!

Internet

Link Metadata

3rd Floor Main Library

Holdings details from 3rd Floor Main Library
Call Number: A1234.567
Copy 1 Available